A solar project looks simple on paper: sun, land, panels, a connection to the grid. In practice, most of the risk sits in the months before construction starts. The questions below are the ones we ask first, because a wrong answer to any of them can stop a project that otherwise looks attractive.
Who controls the land, and for how long
Start with ownership. Confirm who the registered owner is, whether there are co-owners, mortgages, easements, or disputes, and whether the plot boundaries on paper match the ground.
Then look at the terms. A photovoltaic plant is expected to run for decades, so a lease or purchase agreement has to cover that period, including access roads and the cable route to the connection point. An option agreement, which reserves the site while you complete your checks, often makes sense before any larger commitment.
What the land may be used for
Not every plot can host an energy project. Check the current land-use classification and the applicable spatial plan, and whether a change of use is needed. Protected areas, agricultural land of a high class, and proximity to homes, roads, or water can each add conditions or rule a site out.
Whether the grid can take the power
Grid access is frequently the deciding factor. A site with excellent sun and no available capacity nearby is not a project. Early on, establish:
- the distance to the nearest suitable connection point;
- whether capacity is available there, and at what voltage level;
- who pays for the connection line and any reinforcement;
- how long the operator’s process takes.
The answers come from the grid operator, and getting them in writing is worth the wait.
The physical site
A site visit and basic technical review answer questions that maps do not: slope and orientation, shading from terrain or buildings, soil and drainage, flood risk, and how construction vehicles will reach the plot. These determine the layout, the mounting system, and a meaningful part of the cost.
The permit path
List every permit and approval the project needs, the authority that issues each one, the order in which they must be obtained, and a realistic duration for each. Environmental review, construction permits, and energy licences often depend on one another. A timetable built from this list is more reliable than a general estimate.
Who builds it, and who answers for it
Finally, look at the delivery side: the designer, the equipment suppliers, the installer, and the warranties each provides. Clear responsibility for performance, defects, and deadlines matters more than a small difference in price.
Before the numbers
Only when these points are settled does a financial model mean much. An early, structured review costs little compared with the commitments that follow, and it tells you whether to proceed, renegotiate, or look at another site.
This article is general information and is not legal, technical, or financial advice. Rules and procedures differ by location and change over time; confirm the current requirements for your project.